| Under voltage sensing (90% pickup 80%
dropout) of the utility on any phase adjustable 190 to
500v |
| Voltage frequency sensing of the
generator source set for 50 / 60 Hz |
| Time delay engine start adjustable 0 to
60 seconds |
| Time delay engine warm up 10 seconds |
| Time delay utility (mains)
stabilization / retransfer to utility (mains) adjustable
0 to 4 minutes |
| Time delay engine cool down adjustable
0 to 4 minutes |
| Removable Key control 4 position: Off,
Auto, Test, Run Generator |
| Generator exerciser on - off every 7
days run for 15 minutes |